facebook-pixel
Stop juggling jobs across WhatsApp + Excel.AI Dispatcher live → 1:1 demo (SGT)

WATER DAMAGE MITIGATION & RESTORATION

Water damage restoration software for the contractor running the business not the documentation.

From the 2 AM burst-pipe call to the daily psychrometric drying log to the deductible at signature. FieldCamp models the way a mitigation shop actually works — not a documentation tool that stops at the report, not generic FSM with a category swap.

Book a 15-minute callWe'll spin up your drying-log template on the call.
4.8Capterra

Trusted by water-damage mitigation contractors
from a two-truck independent to a multi-state operator.

Water mitigationMold remediationFire & smokeSewage / biohazardReconstructionProperty mgmt

01  The water-loss data model

Property → Loss → Affected Room → Drying Equipment — finally one record.

FieldCamp ships a restoration layout with typed custom objects: carrier, claim number, adjuster, category, class, drying goal MC, equipment serial — structured fields, not a notes-field dump. It doubles as your restoration CRM — homeowner, carrier, adjuster, and property manager on one record.

The canonical Property data model sits underneath. Stages & Workflows enforce Inspect → Mitigate → Dry → Restore phasing, and carrier, claim #, and adjuster live as Custom Fields on the Property — every estimate, photo, and invoice linked to the right loss.

412 Riverside Dr
Object graphproperty_loss

412 Riverside Dr

Westport, CT · Sarah Park

Active
Single-familyState FarmClaim 45-AA-9921Cat 2 / Class 2
Loss · #45-AA-9921Burst supply line · FNOL 02:14 AM Day 0
Upstairs Laundry80 sqft · Goal metGoal met
Hallway60 sqft · DryingDrying
Master Bedroom220 sqft · MC unchanged 48hrOverdue
Drying equipment · deployed5 units
LGR Dehu DEH-217Dri-Eaz LGR 7000XLi · S/N 4421988
Air Mover AM-029Phoenix Axial 1
Air Mover AM-030Phoenix Axial 1
Air Mover AM-031Phoenix Axial 1
HEPA Scrubber HEP-04Phoenix Guardian
Drying progress · last 72hrgoal 12%
Upstairs Laundry12%Goal met
Hallway14%Trending down
Master Bedroom16%Unchanged 48hr
Drying goal MC 12% (dashed marker)
Recordaffected_room

Master Bedroom · 220 sqft

412 Riverside Dr · Loss #45-AA-9921

Overdue
OverviewDrying logFiles
Specs
MaterialsSelectDrywallHardwoodCarpet pad
Sq ftNumber220
Drying goal MCNumber12%
Unaffected referenceNumber8%
Last readingDateDay 3 · 14:08
Equipment placedLookupDEH-217 · AM-031 · HEP-04
Live psychrometric · Day 3 14:08

Temp

92°F

RH

38%

Dew pt

64°F

GPP

112

MC

16%

Loss approaching 48-hour mold-watch threshold. Master Bedroom MC unchanged at 16% · escalate to S520 protocol?

Property → Loss → Room → Equipment, one record

Linked records

Drying Equipment links to the Affected Room. Rooms link to the Loss. Losses link to the Property. Open one property and see every loss, room, daily reading, and visit in place.

Typed fields

Carrier, claim #, adjuster, category, class, drying goal moisture content — structured fields with real types, never a notes-field dump.

Mold-watch is a field

Each Affected Room tracks days since baseline; cross 48 hours without MC drop and a Workflow fires before the adjuster does.

Shared record views

One record per property and loss — drying log, photos, carrier docs, files. The same view your CSRs, dispatchers, techs, and the adjuster review.

02  24/7 emergency intake

The 2 AM burst-pipe call — answered, triaged, and on the board before your dispatcher's coffee.

Your branded online booking form is the front door. The AI Chat Assistant runs a Playbook that triages the loss — Cat 1 vs Cat 2 vs Cat 3, room count, carrier on file — then hands off to a human dispatcher with the request already qualified.

The call, SMS, WhatsApp thread, and AI conversation land on one unified inbox , and the qualified inquiry becomes a Request with urgency Critical — one click from a Job.

REQ-3781 · 412 Riverside Dr
Branded booking widgetai_chat_assistant
BlueRidge Restoration · 24/7
Hi, my upstairs laundry just flooded around 2 AM.
AII'm sorry, Sarah. Quick triage — is the water clean tap water, or has it touched a toilet or drain?
Clean — burst supply line behind the washer.
AIHow many rooms have water?
Three — laundry, hallway, bedroom.
AIState Farm is on file from your last service — still right?
Yes.
AIA dispatcher will call in 4 minutes with the ETA. A technician is being routed now.
Cat 2 likely3 roomsState Farm

AI Chat Assistant runs the Playbook · hands off to a human dispatcher · not a fully autonomous receptionist.

Inbox v3 · one Request threadinbox
AI request summaryCritical

Sarah Park · burst supply line, upstairs laundry · 3 rooms affected · State Farm carrier · Cat 2 likely · ETA-sensitive.

AI Chat

02:14 AM

Playbook qualified Sarah Park · Cat 2 / 3 rooms / State Farm

Inbound call

02:18 AM · 3:42

AI summary: "Burst supply line, 3 rooms, State Farm, ETA-sensitive."

SMS

02:21 AM

"Confirmed Tariq arriving 02:47."

Request · REQ-3781Critical
CustomerSarah ParkSite412 Riverside DrCarrierState FarmUrgencyCritical
AI triaged. Human dispatched. 4-minute callback.

03  Skill-aware emergency dispatch

Route the loss to your closest IICRC-certified tech — not the closest pin.

AI Dispatcher matches the loss to a technician on three dimensions, not one: certification (WRT, ASD, AMRT), zone, and real driving distance. Hierarchical Skills hold each tech's IICRC certifications, so a Cat 3 sewage loss never lands on a tech who can't legally complete it.

24/7 schedules and service-area zones keep after-hours rotations honest. Each loss files as a high-priority job type, and live GPS plus a homeowner-facing ETA link turn "how soon?" into "Tariq's truck is 22 minutes out."

New emergency · 412 Riverside Dr
Live dispatch mapdispatcher_map
Riverside DrBridge St412 Riverside DrDiana K. · 8 minWRTMarcus M. · 14 minWRT + ASDTariq B. · 22 min ★WRT + ASD + AMRT

Hierarchical skills: WRT → +ASD → +AMRT. Loss type filters to qualified techs only.

AI Dispatcher · recommendedAI suggested

Tariq B. · 22 min drive

WRT + ASD + AMRT certified

Cat 2 with mold-watch risk (48hr from threshold).

AMRT cert required for potential S520 escalation.

Diana K. closer but no AMRT — risk of re-dispatch in 36hr.

BlueRidge ETA · live

Tariq B.

WRT + ASD + AMRT

22 min

Track his truck · refresh 30s

fc.link/eta/x42 · login-free

Cert-aware, zone-aware, drive-time-aware

04  The daily drying log

An S500-shaped checklist that runs on the tech's phone — even with no signal in the basement.

FieldCamp's Job Forms turn the IICRC S500 daily drying log into a digital checklist — dry-bulb, RH, dew point, GPP, equipment placement, customer initials — plus per-room moisture readings. Techs complete forms on the phone with photos, signatures, and offline sync.

The admin form builder holds the template. Each daily check is one Visit on the parent Job, and Job Logs with custom log templates capture labor, mileage, and expenses per Visit. FieldCamp doesn't connect direct to your Protimeter or Delmhorst — readings are typed or dictated, and the meter-face photo attaches as evidence.

Day 3 · Visit 3 of 5 · Tariq B.
Job Form · mobilejob_form

BlueRidge Restoration

Cat 2 / Class 2 daily drying log

Chamber readings

Temp92°FRH38%Dew pt64°FGPP112

Per-room MC

Upstairs Laundry

A 12% · B 11% · C 12%

Hallway

A 13% · B 13% · C 12%

Master Bedroom

A 16% · B 16% · C 17%

Unchanged from Day 1

Equipment placement

DEH-217

AM-031

HEP-04

Customer ack · SP

Offline · synced 3

Readings are typed or voice-dictated. No moisture-meter Bluetooth/OCR claim — photo of the meter face attaches as evidence.

Visit 3 · Job Logjob_log
Labor2.5 hr · Tariq B.
Mileage18 mi · Truck 3
Antimicrobial0.5 gal · BOTANIClean
Expenses$0

Per-loss profitability rollup

Days

3 of est 5

Labor cost

$385

Equipment-days billed

9

Margin estimate

+$2,140

Mold-watch · Master Bedroom MC unchanged 48hr. Auto-task Tariq to take a fresh thermal reading + email adjuster Lisa Chen with the Day 3 summary?

S500-shaped. Phone-first. Offline-safe.

05  Multi-day drying as one job

A 5-day water loss is one Job with five Visits — phasing, photos, readings stay together.

A water loss is one Multi-day Job with one Visit per drying day Inspect & Extract, Set Containment, Daily Drying Checks, Equipment Pickup, Final Reading. Stages & Workflows require signatures and photos before a phase advances.

The multi-day setup guide walks through reusable templates like "Water Loss · Cat 2 / 1500 sqft." Conflict detection stops double-booked drying checks, and a mold-watch Workflow fires when an Affected Room's MC hasn't moved in 48 hours.

JOB-2041 · Riverside Dr · Cat 2 / Class 2 · Day 3 of 5
Stages & Workflowsmulti_day_job
Day 0 · Inspect & ExtractDay 1 · Set ContainmentDays 2-5 · Daily Drying ChecksDay 6 · Equipment PickupDay 7 · Final Reading & Antimicrobial

Visits · 5 of 5

Visit 1

Day 0

Tariq B.

4 hr12 photos
Done

✓ Signed

Visit 2

Day 2

Diana K.

1 hr6 photos
Done

✓ Signed

Visit 3

Day 3

Tariq B.

1.5 hr8 photos
In progress

Visit 4

Day 4

Diana K.

1 hr
Scheduled

Visit 5

Day 5

Tariq B.

1.5 hr
Scheduled

Drying days elapsed

3

Avg MC trend

−18%

Equipment on site

5 units

Days against goal

+1

Mold-watch checkpoint at 48hr → triggers Workflow

Auto-task tech to re-inspect Master Bedroom + email adjuster Lisa Chen with the day's readings.

One Job · five Visits · phases enforced

06  Your drying-equipment fleet

80 dehus, 200 air movers, and the warehouse manager finally knows where they are.

Each dehumidifier, air mover, and HEPA scrubber is a record. Inventory Management tracks the fleet across warehouse and truck, and a Drying Equipment custom object ties each serialized unit to its Affected Room — no GPS chip required; location moves with the Visit.

Custom Fields hold brand, model, serial, and calibration-due date; on-site days roll up to billable equipment-day line items via Job Logs .

Drying equipment · 287 units · Aug 14
Fleet · by locationinventory_locations

Warehouse · Westport

LGR Dehus38 units · varied serials
Air Movers142 units · Phoenix Axial 1 / Drieaz Sahara
HEPA Scrubbers21 units · Phoenix Guardian

Truck #4 · Diana K.

LGR Dehu DEH-441Dri-Eaz LGR 7000XLi · S/N 8821990
3× Air MoversPhoenix Axial 1
1× HEPAPhoenix Guardian

Deployed at 412 Riverside Dr

Linked · Visit 3
LGR Dehu DEH-217Dri-Eaz LGR 7000XLi · S/N 4421988 · Day 0 · on-site 3 days
3× Air Movers AM-029/030/031Phoenix Axial 1
HEPA HEP-04Phoenix Guardian
Custom object inspectordrying_equipment

LGR Dehu · DEH-217

Deployed · 412 Riverside Dr

Deployed
Specs
BrandSelectDri-Eaz
ModelTextLGR 7000XLi
SerialText4421988
CapacityNumber130 ppd
Calibration dueDateNov 4, 2026Due soon
Current locationLookupMaster Bedroom
Deployed-at PropertyLookup412 Riverside Dr
On-site daysComputed3 daysBillable
Linked to: Visit 3 · Affected Room: Master Bedroom · Job: JOB-2041

Location is a field, not a GPS chip. Same primitive as Property and Affected Room.

Serialized fleet. Linked to the room it's drying.

07  Good-better-best estimate

Three options. One signature. The work starts before the floor finishes draining.

Estimate Options support good/better/best tiers — frame them as Mitigate-Only, Mitigate + Restore, Full Build-back — and the homeowner picks one on the spot. Equipment-day pricing comes from the price book and bundles; signatures with timestamp and audit trail close the Work Authorization on the tech's phone.

Build from a saved template, attach the Work Authorization terms, and the approved tier converts via estimate → job → invoice — carrier and claim number stay linked to the Property via Custom Fields.

EST-3104 · Sarah Park · Day 0
Three-tier estimateestimate_options
Sarah Park · 412 Riverside Dr
State Farm claim #45-AA-9921

Mitigate-Only

Drying + extraction + containment

Declined

$4,820

Mitigate + Restore

★ Best value

Plus drywall, paint, flooring

✓ e-signed · Day 0 · 03:47 AM

$12,640

Full Build-back

Plus cabinetry, millwork

$28,300

Equipment-day bundles
Dehumidifier-day ×3$115/day
Air-mover-day ×9$35/day
HEPA-day ×3$90/day
Antimicrobial ×1$180

Customer authorization · Work Authorization Form

Sarah Park
SignedDay 0 · 03:47 AMDeviceiPhone · 192.168.1.42WitnessTariq B.

Custom Fields on Property

CarrierState Farm
Claim #45-AA-9921
AdjusterLisa Chen
Adjuster emaillisa.chen@statefarm-claims.com

Carrier and claim # are Custom Fields on the Property — every photo and invoice stays linked to the right loss.

Three options. One signature. Work begins.

08  Deductible at signature. Invoice at drying-end.

Get paid faster than the adjuster reviews.

Collect the deductible as a deposit at work start via Stripe-powered online card payments (plus manual cash/check). The mitigation invoice goes out the moment the final reading is signed, drying-log PDF and photo evidence attached for the carrier.

With Stripe connected to your account, auto-deducting payments handle progress invoicing through the build-back, and everything syncs two-way to QuickBooks, Xero, or Wave on the Pro plan — no double entry.

Day 0 · Deposit collectedPaid

Deductible · $2,500.00

Sarah Park · State Farm deductible

Stripe online card

pay.fc.link/deductible-3104

Card ending•••• 4242
Paid4 min after sig
Applied to estimate
Day 5 · Mitigation invoiceReady

INV-7220 · State Farm claim #45-AA-9921

Extraction & containment$1,820
Dehumidifier-days ×3$345
Air-mover-days ×9$315
HEPA-days ×3$270
Antimicrobial$180
Subtotal$2,930.00
CT tax$186.00
Less deposit−$2,500.00
Balance$616.00
📄 Drying log PDF📷 Photo evidence ×14✓ QuickBooks
Day 22 · Build-back progressAuto-charged

Progress invoice · $6,320

Build-back 50% complete

Progress

50% completeDay 22 of est 28
Auto-charged from Sarah's card on file. Synced to QuickBooks.

Stripe online card + deposits + manual cash/check + recurring auto-pay. FieldCamp's docs do not currently confirm Tap-to-Pay, Apple Pay, or ACH bank transfer.

09  The adjuster keeps up

Every drying day, the adjuster gets the readings, photos, and equipment justification — without your office calling.

A Workflow triggered on Visit-complete builds a Visit Summary PDF from that day's readings, photos, and equipment placement, then emails it to the adjuster on file.

Drying logs and photo evidence live on the Property's Files & Drive tab — the subrogation packet is already assembled. Adjuster name, email, and claim # sit on the Property as Custom Fields , and workflow examples plus pre-built workflow templates get you live in an afternoon.

Auto-update adjuster · enabled
Workflow builderworkflow_canvas
Triggernode_1

Visit complete

Fires when a Visit on a Water Loss Job is signed off

Conditionnode_2

Job type = Water Loss AND Adjuster Email exists

Actionsnode_3

Generate Visit Summary PDF (readings, equipment placement, photos)

Email PDF to {{Property.Adjuster Email}} subject: Day {{Visit.day}} drying update · 412 Riverside Dr

Log activity to Property timeline

Lisa Chen · inboxadjuster_inbox

BlueRidge Restoration

Day 1 · drying update — 412 Riverside Dr

5:42 PM MonPDF

BlueRidge Restoration

Day 2 · drying update — 412 Riverside Dr

5:48 PM TuePDF

BlueRidge Restoration

Day 3 · drying update — 412 Riverside Dr · mold-watch flagged

5:51 PM WedPDF
Visit 3 · Drying Log PDFAuto-sent

412 Riverside Dr · Cat 2 · Tariq B.

Temp

92°F

RH

38%

GPP

112

3 rooms · 8 photos · mold-watch alert · equipment placement

Justify every equipment line item before the supplement request gets denied.
Daily updates. Zero phone tag. Supplements approved.

10  After the dry

Mit ends, rebuild begins, and the same property record carries through to a 30/60/90-day mold re-check.

Build-back runs as a multi-phase project on the Construction data model demo, drywall, paint, flooring, final inspection — with subcontractors and change orders. Permits attach to the sub-phases that need an AHJ inspection.

Once the rebuild closes, Recurring Jobs spin up 30/60/90-day mold re-inspections automatically, reconstruction material warranties live on the Warranties record, and the Command Center AI chat answers "show restoration jobs with re-inspection due this week."

412 Riverside Dr · post-mitigation arc
Build-back projectconstruction_project

PRJ-218 · BlueRidge Build-back

412 Riverside Dr · Day 22 of est 28

Active
DemoSigned
DrywallPermit BLD-2026-9921 · Caldera
PaintDay 24
FlooringWestport Flooring
Final inspectionPending AHJ

Caldera Drywall

2 crew· Approved

Westport Flooring

1 crew· Scheduled

AHJ packet

Permit BLD-2026-9921 · Drywall stamped

Recurring Jobsrecurring_jobs
Post-Restoration Mold Re-InspectionAuto-scheduled

Every 30 days for 3 months

Visit · Day 30Diana K.Sep 14
Visit · Day 60Tariq B.Oct 14
Visit · Day 90Diana K.Nov 14
Command Center

"Show all restoration jobs with re-inspection due this week."

412 Riverside Dr · Day 30 · Sep 14

28 Lighthouse Ln · Day 60 · Sep 16

119 Marsh Rd · Day 90 · Sep 17

Material warranties tracked

Sherwin-Williams paint · 7yrMohawk hardwood · 25yrCaldera workmanship · 1yr
One record. Mitigation → rebuild → re-inspection.

11  Capabilities

Everything else a restoration shop runs on, on one platform.

Built around the mitigation lifecycle — not bolted on. No swivel-chair between five tools, no spreadsheet for who has which dehu. WhatsApp for property managers, call recordings with AI summaries for the after-hours review, and add-ons for AI Dispatcher, online booking, and voice. Every tile below links to its docs.

12  Why it matters

Cycle time — not job count — is the number that decides whether you scale past $3M.

Three reasons restoration contractors switch — and stay. Each point recaps a grounded section above: the lead-to-payment workflow and FieldCamp core building blocks turned into a contractor's lived KPIs.

01

Cycle time is the number.

Documentation tools chase compliance. Estimating tools chase Xactimate. The number that decides whether you scale past $3M is the days between FNOL and invoice paid. FieldCamp threads intake → dispatch → daily drying log → deductible → mitigation invoice → build-back → re-inspection on one record so cycle time stops bleeding to swivel-chair.

02

Adjusters approve what they can defend.

Supplements get kicked back when the equipment line items aren't justified by daily psychrometric readings. FieldCamp's Workflow sends the adjuster the readings, photos, and equipment placement every drying day — without your office calling. The defensible documentation builds itself.

03

You're not Encircle. You're not Xactimate. Stop paying like one.

Encircle and CoreLogic Mitigate own the moisture map and the S500 chart — keep using them if you do. Xactimate is the carrier-side estimating rail — your scope exports there as a PDF. FieldCamp is the contractor's operating system underneath: dispatch, drying coordination, deductible collection, build-back, recurring re-inspections.

14  FAQ

Questions restoration contractors actually ask before they switch.

Honest answers for the mitigation contractor comparing FieldCamp to Albi, DASH, JobNimbus, or documentation tools like Encircle and CoreLogic Mitigate. If we don't ship something — Tap-to-Pay, direct Xactimate ESX, autonomous phone receptionist, GPS chips on dehumidifiers — we say so.

Water damage restoration software is the all-in-one operating system that runs a mitigation and restoration shop — 24/7 emergency intake (online booking widget + AI chat assistant + unified inbox for calls/SMS/WhatsApp/email), AI dispatch routed by IICRC certification and drive-time, multi-day Job phasing for the 3-7 day drying period, daily psychrometric drying logs as digital Job Forms on the technician's phone, good-better-best estimates with equipment-day bundle pricing, Stripe-powered deductible deposits, mitigation and build-back progress invoicing synced to QuickBooks/Xero/Wave, and an adjuster-facing Workflow that emails the daily reading PDF automatically. FieldCamp is positioned as the contractor's operating system — not a documentation specialist like Encircle or CoreLogic Mitigate, and not the carrier-side Xactimate estimating rail.

No — and we won't pretend otherwise. Encircle Hydro and CoreLogic Mitigate own the moisture map, psychrometric chart UI, and S500-style documentation specialist tooling brilliantly. FieldCamp captures the daily readings (temperature, RH, dew point, GPP, moisture content) as numeric fields on a Job Form via the digital checklist system, links Drying Equipment as a Custom Object to each Affected Room, and turns those readings into an adjuster-ready PDF automatically — but it sits underneath as the contractor's operating system (intake, dispatch, deductible, invoice, build-back, recurring re-inspections). Keep using Encircle or Mitigate if you already do — FieldCamp doesn't replace them.

Not via direct Xactimate ESX or XactAnalysis API sync. FieldCamp exports the drying log, photos, and equipment placement as a PDF/web link the adjuster can review or paste into Xactimate. Insurance carrier and claim # are tracked as Custom Fields on the Property record, so every estimate, invoice, and photo stays linked to the right loss — and the daily Workflow keeps the adjuster current in real time, which is usually what unlocks supplement approval anyway.

The AI Chat Assistant on your booking page runs 24/7 and qualifies the emergency inquiry — when the water started, whether it has touched a drain (Cat 1 vs Cat 2 vs Cat 3), how many rooms, which carrier — then hands off to a human dispatcher who calls back with the ETA. It's a hybrid receptionist (virtual triage + human handoff), not a fully autonomous phone-answering AI. FieldCamp's docs are explicit about the handoff model, so we are too. The unified Inbox v3 routes calls, SMS, WhatsApp, and email into the same thread so the dispatcher has full context the moment they pick up.

Each Affected Room tracks its baseline and daily moisture-content readings. When MC hasn't dropped for 48 hours, a Workflow fires — auto-tasking the technician to re-inspect with a thermal photo and emailing the adjuster the mold-watch alert with the room's reading history. From there you can escalate the Job to your S520 mold-remediation workflow with new Stages — AMRT-certified techs get filtered via Hierarchical Skills on AI Dispatcher so the right person handles the escalation.

Yes. A water loss is a single Multi-day Job with one Visit per drying day — not five disconnected jobs. The Multi-day Jobs overview confirms support for insulation, renovations, and commercial projects, which maps cleanly onto a 3-7 day water-damage drying period. Stages & Workflows enforce phase progression (Inspect & Extract → Set Containment → Daily Drying Checks → Equipment Pickup → Final Reading), conflict detection prevents two visits from double-booking the same Property, and Job Logs roll labor + mileage + equipment-days into the mitigation invoice automatically.

IICRC certifications live as Skills on each technician in AI Dispatcher's Hierarchical Skills system. When a new loss comes in, the dispatcher's recommendation engine filters to qualified techs only — so a Cat 3 sewage loss never lands on a WRT-only tech, and the AMRT-required mold escalation routes to the right person. Skill matching combines with zone, business schedule (24/7 emergency rotations), and real driving distance so the closest pin isn't always the right pin.

Yes — via Stripe-powered online card payments, with the deductible structured as a Deposit at work start. The customer signs the Work Authorization on the technician's phone (with timestamp + audit trail), pays the deposit via the emailed Stripe link, and the deposit applies to the mitigation invoice automatically. To be precise about what we ship: FieldCamp's payments docs confirm Stripe online card + deposits + recurring auto-pay + manual cash/check — they do not currently confirm Tap-to-Pay, Apple Pay, or ACH. Two-way sync to QuickBooks, Xero, or Wave is included on the Pro plan.

Get started

Want restoration software built around your daily drying log?

Fifteen minutes. We'll spin up your daily drying-log template, your IICRC skill matrix, and your auto-adjuster Workflow on the call.